Planning condition
EA - FRA
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0118626 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0118626 | Facts |
| Name | EA - FRA | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | These mitigation measures are imposed to prevent flooding elsewhere by ensuring that flood water is not passed on to others as required by Policies 55 and 56 of the Local Plan. | Facts |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment (ref December 2022 - JBA Consulting - Doncaster Waterfront) and the following mitigation measures it details: There shall be no ground level raising as a result of the remediation works These mitigation measures shall be fully implemented prior to the use first commencing and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73002393,
"name": "EA - FRA",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0118626",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "These mitigation measures are imposed to prevent flooding elsewhere by ensuring that flood water is not passed on to others as required by Policies 55 and 56 of the Local Plan.",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (ref December 2022 - JBA Consulting - Doncaster Waterfront) and the following mitigation measures it details: There shall be no ground level raising as a result of the remediation works These mitigation measures shall be fully implemented prior to the use first commencing and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.",
"organisation-curie": "local-authority:DNC"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.