{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002393,"name":"EA - FRA","dataset":"planning-condition","typology":"policy","reference":"U0118626","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"These mitigation measures are imposed to prevent flooding elsewhere by ensuring that flood water is not passed on to others as required by Policies 55 and 56 of the Local Plan.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (ref December 2022 - JBA Consulting - Doncaster Waterfront) and the following mitigation measures it details: There shall be no ground level raising as a result of the remediation works These mitigation measures shall be fully implemented prior to the use first commencing and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}