Brownfield land

17SC0004

Field Value Fact links
Reference 17SC0004 Facts
Prefix brownfield-land Facts
Name 17SC0004 Facts
Dataset Brownfield land no fact link
Organisation South Cambridgeshire District Council no fact link
Start date 2017-12-31 no fact link
End date 2019-12-15 no fact link
Entry date 2017-12-31 Facts
Typology geography no fact link
Point POINT (0.0934 52.15169) Facts
Notes Planning History: Outline planning permission was granted in February 2010 for up to 380 dwellings and other uses. This permission has now lapsed. | Phase 1 detailed planning permission for 201 dwellings was granted in November 2014 and the development is under construction. | Detailed masterplanning of the site has resulted in the site being anticipated to provide 285 dwellings, rather than 380 dwellings as anticipated in the outline planning permission.. Planning Status: Allocated in Policy SP/8 in the Site Specific Policies Development Plan Document (2010) Facts
Hectares 8.76 Facts
Deliverable yes Facts
Site address Bayer CropScience,Hauxton, Cambridgeshire Facts
Site plan url https://gismaps.scambs.gov.uk/connect/analyst/mobile/#/main?mapcfg=BrownFieldRegister_New&queryTable=/NamedTables/SCDC_Brownfieldregister&queryColumn=Site_Reference&queryValues=17SC0004 Facts
Ownership status not-owned-by-a-public-authority Facts
Maximum net dwellings 285 Facts
Planning permission date 2010-02-12 Facts
Planning permission type other Facts
Planning permission status permissioned Facts
Planning permission history http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2308/06/O Facts

Available Code Snippets:

{
    "reference": "17SC0004",
    "prefix": "brownfield-land",
    "name": "17SC0004",
    "dataset": "brownfield-land",
    "organisation-entity": "281",
    "start-date": "2017-12-31",
    "end-date": "2019-12-15",
    "entry-date": "2017-12-31",
    "typology": "geography",
    "geometry": "",
    "point": "POINT (0.0934 52.15169)",
    "entity": 1727540,
    "notes": "Planning History: Outline planning permission was granted in February 2010 for up to 380 dwellings and other uses. This permission has now lapsed. | Phase 1 detailed planning permission for 201 dwellings was granted in November 2014 and the development is under construction. | Detailed masterplanning of the site has resulted in the site being anticipated to provide 285 dwellings, rather than 380 dwellings as anticipated in the outline planning permission.. Planning Status: Allocated in Policy SP/8 in the Site Specific Policies Development Plan Document (2010)",
    "hectares": "8.76",
    "deliverable": "yes",
    "site-address": "Bayer CropScience,Hauxton, Cambridgeshire",
    "site-plan-url": "https://gismaps.scambs.gov.uk/connect/analyst/mobile/#/main?mapcfg=BrownFieldRegister_New&queryTable=/NamedTables/SCDC_Brownfieldregister&queryColumn=Site_Reference&queryValues=17SC0004",
    "ownership-status": "not-owned-by-a-public-authority",
    "maximum-net-dwellings": "285",
    "planning-permission-date": "2010-02-12",
    "planning-permission-type": "other",
    "planning-permission-status": "permissioned",
    "planning-permission-history": "http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2308/06/O"
}
Loading...

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.

Geographical area


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.