{"entry-date":"2017-12-31","start-date":"2017-12-31","end-date":"","entity":1727540,"name":"17SC0004","dataset":"brownfield-land","typology":"geography","reference":"17SC0004","prefix":"brownfield-land","organisation-entity":281,"geometry":"","point":"POINT (0.0934 52.15169)","quality":"authoritative","notes":"Planning History: Outline planning permission was granted in February 2010 for up to 380 dwellings and other uses. This permission has now lapsed. | Phase 1 detailed planning permission for 201 dwellings was granted in November 2014 and the development is under construction. | Detailed masterplanning of the site has resulted in the site being anticipated to provide 285 dwellings, rather than 380 dwellings as anticipated in the outline planning permission.. Planning Status: Allocated in Policy SP/8 in the Site Specific Policies Development Plan Document (2010)","hectares":"8.76","deliverable":"yes","site-address":"Bayer CropScience,Hauxton, Cambridgeshire","site-plan-url":"https://gismaps.scambs.gov.uk/connect/analyst/mobile/#/main?mapcfg=BrownFieldRegister_New&queryTable=/NamedTables/SCDC_Brownfieldregister&queryColumn=Site_Reference&queryValues=17SC0004","ownership-status":"not-owned-by-a-public-authority","planning-permission-date":"2010-02-12","planning-permission-type":"other","planning-permission-status":"permissioned","planning-permission-history":"http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2308/06/O"}