53484d5a40571c8091586fd230c07a3d05a51b74a147ef5703090ca74f87ebb7 description The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-02-25