Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

EA 1

Field Value Fact links
CURIE planning-condition:U0111957 no fact link
Prefix planning-condition Facts
Reference U0111957 Facts
Name EA 1 Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development and future occupants Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "curie": "planning-condition:U0111957",
        "prefix": "planning-condition",
        "reference": "U0111957",
        "name": "EA 1",
        "dataset": "planning-condition",
        "organisation-entity": "local-authority:DNC",
        "start-date": "",
        "end-date": "",
        "entry-date": "2025-02-25",
        "typology": "policy",
        "geometry": "",
        "point": "",
        "entity": 73000977,
        "quality": "some",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.