Ancillary infrastructure
Provenance
1 result
Fields:
description
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
47714a37997b220972f4b45aa710c823335a0f6b1dc3aa98f53bfb58b6297b66 | description | The need forinfrastructure such as sub-stations, pumping stations and plant and equipment, including water tanks, must be considered at the outset of the design process and integrated into the design of the building or site. | 2024-06-11 |