Fact

47714a37997b220972f4b45aa710c823335a0f6b1dc3aa98f53bfb58b6297b66
Field Value
Fact 47714a37997b220972f4b45aa710c823335a0f6b1dc3aa98f53bfb58b6297b66
Field description
Value The need forinfrastructure such as sub-stations, pumping stations and plant and equipment, including water tanks, must be considered at the outset of the design process and integrated into the design of the building or site.
Entity Ancillary infrastructure
Earliest entry date 2024-06-11
Latest entry date 2024-06-11
Latest resource b10c0cabae9dcf9a2c0f1e1bef022c7299ba8694b8607823da3ded8d2cb82574
Resources
Entry Date Resource
2024-06-11 b10c0cabae9dcf9a2c0f1e1bef022c7299ba8694b8607823da3ded8d2cb82574