Fact
ce671d2b80d2b5daac7f88129a1ab709c46ad2e0cec05a140c74f638a7e6c151
ce671d2b80d2b5daac7f88129a1ab709c46ad2e0cec05a140c74f638a7e6c151
|
notes
|
Site benefits from planning permission CR/2016/0294/OUT: 'Outline application (all matters reserved) for demolition of existing office building and integrated railway station building, footbridges and ancillary structures. Erection of 308 studio, 1, 2 and 3 bedroom residential apartments and assorted parking (C3 use class); integrated railway station building, footbridges, and ancillary structures; flexible use retail / coffee shop / business centre (A1 / A3 / B1 use classes); 120 space multi-deck station car park, vehicle drop-off lay-by and associated highway works and public realm enhancements.' Allocated as a Town Centre Key Opportunity Site for residential and/or town centre uses in Local Plan Policies EC6 (Development Sites within the Town Centre Boundary) and H2 (Key Housing Sites). Policies TC3 and H2 of the Regulation 19 draft Local Plan Review document propose the retention of this allocation. The current developer intentions for the site are set out in Reserved Matters application CR/2019/0602/ARM and full planning application CR/2019/0660/FUL. These benefit from a resolution to grant permission subject to conclusion of a S106 agreement, although the progression of the scheme to permission has been slowed by the requirement for development within the Sussex North Water Resource Zone to be water neutral, in accordance with the Natural England position statement of September 2021.
|
CBCBLR023
|
2022-12-22
|
2022-12-22
|
232296617df7a4de35889901cea97b52e7b11c6065730e464394edc1ecd5827d
|
Resources
232296617df7a4de35889901cea97b52e7b11c6065730e464394edc1ecd5827d
|