Brownfield land
CBCBLR023
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:CBCBLR023 | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | CBCBLR023 | Facts about Reference |
| Name | CBCBLR023 | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Crawley Borough Council | no fact link |
| Start date | 2017-11-29 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2024-12-13 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-0.185314 51.117011)
|
Facts about Point |
| Notes | The site benefits from planning permission CR/2016/0294/OUT: 'Outline application (all matters reserved) for demolition of existing office building and integrated railway station building, footbridges and ancillary structures. Erection of 308 studio, 1, 2 and 3 bedroom residential apartments and assorted parking (C3 use class); integrated railway station building, footbridges, and ancillary structures; flexible use retail / coffee shop / business centre (A1 / A3 / B1 use classes); 120 space multi-deck station car park, vehicle drop-off lay-by and associated highway works and public realm enhancements.' The site is allocated as a Town Centre Key Opportunity Site for residential and/or town centre uses in Policies TC3 (Key Town Centre Opportunity Sites) and H2 (Key Housing Sites) of the Crawley Borough Local Plan 2023-2040. The current developer intentions for the site are set out in Reserved Matters application CR/2019/0602/ARM and full planning application CR/2019/0660/FUL. These benefit from a resolution to grant permission subject to conclusion of a S106 agreement, although the progression of the scheme to permission has been slowed by the requirement for development within the Sussex North Water Resource Zone to be water neutral, in accordance with the Natural England position statement of September 2021. | Facts about Notes |
| Hectares | 2.07 | Facts about Hectares |
| Deliverable | yes | Facts about Deliverable |
| Site address | Overline House, Crawley Station and adjacent Highway, Station Way | Facts about Site address |
| Site plan url | https://crawley.gov.uk/sites/default/files/2025-12/OverlineHouse-BrownfieldLandRegister.pdf | Facts about Site plan url |
| Ownership status | mixed-ownership | Facts about Ownership status |
| Maximum net dwellings | 308 | Facts about Maximum net dwellings |
| Minimum net dwellings | 308 | Facts about Minimum net dwellings |
| Planning permission date | 2016-08-16 | Facts about Planning permission date |
| Planning permission type | outline-planning-permission | Facts about Planning permission type |
| Planning permission status | permissioned | Facts about Planning permission status |
Available Code Snippets:
{
"entry-date": "2024-12-13",
"start-date": "2017-11-29",
"end-date": "",
"entity": 1715971,
"name": "CBCBLR023",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "CBCBLR023",
"prefix": "brownfield-land",
"organisation-entity": 99,
"geometry": "",
"point": "POINT (-0.185314 51.117011)",
"quality": "authoritative",
"notes": "The site benefits from planning permission CR/2016/0294/OUT: 'Outline application (all matters reserved) for demolition of existing office building and integrated railway station building, footbridges and ancillary structures. Erection of 308 studio, 1, 2 and 3 bedroom residential apartments and assorted parking (C3 use class); integrated railway station building, footbridges, and ancillary structures; flexible use retail / coffee shop / business centre (A1 / A3 / B1 use classes); 120 space multi-deck station car park, vehicle drop-off lay-by and associated highway works and public realm enhancements.' The site is allocated as a Town Centre Key Opportunity Site for residential and/or town centre uses in Policies TC3 (Key Town Centre Opportunity Sites) and H2 (Key Housing Sites) of the Crawley Borough Local Plan 2023-2040. The current developer intentions for the site are set out in Reserved Matters application CR/2019/0602/ARM and full planning application CR/2019/0660/FUL. These benefit from a resolution to grant permission subject to conclusion of a S106 agreement, although the progression of the scheme to permission has been slowed by the requirement for development within the Sussex North Water Resource Zone to be water neutral, in accordance with the Natural England position statement of September 2021.",
"hectares": "2.07",
"deliverable": "yes",
"site-address": "Overline House, Crawley Station and adjacent Highway, Station Way",
"site-plan-url": "https://crawley.gov.uk/sites/default/files/2025-12/OverlineHouse-BrownfieldLandRegister.pdf",
"ownership-status": "mixed-ownership",
"maximum-net-dwellings": "308",
"minimum-net-dwellings": "308",
"planning-permission-date": "2016-08-16",
"planning-permission-type": "outline-planning-permission",
"planning-permission-status": "permissioned"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.