Planning condition
CTMP
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0116899 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0116899 | Facts about Reference |
| Name | CTMP | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-21 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To protect highway safety of the area. | Facts about Reason |
| Description | No construction works shall take place until full details of highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required' o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Wheel Wash facilities o Timing of deliveries | Facts about Description |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73008661,
"name": "CTMP",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0116899",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To protect highway safety of the area.",
"description": "No construction works shall take place until full details of highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required' o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Wheel Wash facilities o Timing of deliveries"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.