Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Planning condition

CTMP

About this entity

Fact links
CURIE planning-condition:U0116899 no fact link
Prefix planning-condition Facts about Prefix
Reference U0116899 Facts about Reference
Name CTMP Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts about Start date
End date Facts about End date
Entry date 2025-06-21 Facts about Entry date
Typology policy no fact link
Notes Unique Condition Facts about Notes
Reason To protect highway safety of the area. Facts about Reason
Description No construction works shall take place until full details of highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required' o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Wheel Wash facilities o Timing of deliveries Facts about Description

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73008661,
        "name": "CTMP",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0116899",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To protect highway safety of the area.",
        "description": "No construction works shall take place until full details of highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required' o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Wheel Wash facilities o Timing of deliveries"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.