{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008661,"name":"CTMP","dataset":"planning-condition","typology":"policy","reference":"U0116899","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To protect highway safety of the area.","description":"No construction works shall take place until full details of highway works have been submitted to and agreed in writing by the Local Planning authority within a Construction Traffic Management Plan. The development shall be carried out in accordance with the agreed details and cover the following points, expanded on as required' o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Wheel Wash facilities o Timing of deliveries"}