Planning condition
FRA Compliance
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0116893 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0116893 | Facts about Reference |
| Name | FRA Compliance | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-21 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To reduce the risk of flooding to the proposed development and future occupants. | Facts about Reason |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment (J Roberts Design Ltd, 2145, August 2019) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.23 metres above Ordnance Datum (AOD). - Finished floor levels shall be set 600mm above ground level. - The caravans should be securely anchored to the ground. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts about Description |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73008655,
"name": "FRA Compliance",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0116893",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants.",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment (J Roberts Design Ltd, 2145, August 2019) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.23 metres above Ordnance Datum (AOD). - Finished floor levels shall be set 600mm above ground level. - The caravans should be securely anchored to the ground. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.