Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Planning condition

FRA Compliance

About this entity

Fact links
CURIE planning-condition:U0116893 no fact link
Prefix planning-condition Facts about Prefix
Reference U0116893 Facts about Reference
Name FRA Compliance Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts about Start date
End date Facts about End date
Entry date 2025-06-21 Facts about Entry date
Typology policy no fact link
Notes Unique Condition Facts about Notes
Reason To reduce the risk of flooding to the proposed development and future occupants. Facts about Reason
Description The development shall be carried out in accordance with the submitted flood risk assessment (J Roberts Design Ltd, 2145, August 2019) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.23 metres above Ordnance Datum (AOD). - Finished floor levels shall be set 600mm above ground level. - The caravans should be securely anchored to the ground. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts about Description

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73008655,
        "name": "FRA Compliance",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0116893",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants.",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment (J Roberts Design Ltd, 2145, August 2019) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.23 metres above Ordnance Datum (AOD). - Finished floor levels shall be set 600mm above ground level. - The caravans should be securely anchored to the ground. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.