{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73008655,"name":"FRA Compliance","dataset":"planning-condition","typology":"policy","reference":"U0116893","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment (J Roberts Design Ltd, 2145, August 2019) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.23 metres above Ordnance Datum (AOD). - Finished floor levels shall be set 600mm above ground level. - The caravans should be securely anchored to the ground. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."}