Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

FRA

About this entity

Fact links
CURIE planning-condition:U0127517 no fact link
Prefix planning-condition Facts
Reference U0127517 Facts
Name FRA Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding, protect property and to ensure exceedance flood waters can flow across the site. Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment by RPS Group referenced HLEF83573 (version 5) dated 21 November 2023, and the following mitigation measures it details: There shall be no land raising as part of the proposals Flood waters will be allowed to flow through the solar farm and across the site Flood resilience construction materials These mitigation measures shall be fully implemented prior to the first export or storage of energy and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73003148,
        "name": "FRA",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0127517",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding, protect property and to ensure exceedance flood waters can flow across the site.",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment by RPS Group referenced HLEF83573 (version 5) dated 21 November 2023, and the following mitigation measures it details: There shall be no land raising as part of the proposals Flood waters will be allowed to flow through the solar farm and across the site Flood resilience construction materials These mitigation measures shall be fully implemented prior to the first export or storage of energy and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.