Planning condition
EA 1
| Field | Value | Fact links |
|---|---|---|
| CURIE | planning-condition:U0111957 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0111957 | Facts |
| Name | EA 1 | Facts |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | no fact link | |
| End date | no fact link | |
| Entry date | 2025-02-25 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To reduce the risk of flooding to the proposed development and future occupants | Facts |
| Description | The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"curie": "planning-condition:U0111957",
"prefix": "planning-condition",
"reference": "U0111957",
"name": "EA 1",
"dataset": "planning-condition",
"organisation-entity": "local-authority:DNC",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000977,
"quality": "some",
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment by BWB Consultancy, referenced DIP-BWB-00-XX-DR-EN-0002_FRA (BWB Ref NTH-2287-FRA) Revision P3, dated 9 June 2017, and following mitigation measures it details; - Finshed floor levels shall be set no lower than the figures presented in Figure 3.1 of the report. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing / phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.