Permitted development right
Development by statutory undertakers
| Field | Value | Fact links |
|---|---|---|
| CURIE | permitted-development-right:XVIII(E)-1977 | no fact link |
| Prefix | permitted-development-right | Facts |
| Reference | XVIII(E)-1977 | Facts |
| Name | Development by statutory undertakers | Facts |
| Quality | Some: We have some data from an alternative source | no fact link |
| Dataset | Permitted development right | no fact link |
| Organisation | Ministry of Housing, Communities & Local Government | no fact link |
| Start date | 1977-03-29 | Facts |
| End date | Facts | |
| Entry date | 2026-06-10 | Facts |
| Typology | category | no fact link |
| Notes | None | Facts |
| Description | Electricity undertakings. Development required for the purpose of the undertaking of any of the following descriptions, that is to say:- (i) the laying underground of pipes, cables or any other apparatus, and the construction of such shafts and tunnels and may be necessary in connection therewith; (ii) the installation in an electric line of feeder or service pillars, or transforming or switching stations or chambers not exceeding (except when constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the installation of service lines to individual consumers from an electric line; (iv) the extension or alteration of buildings on operational land as long as the height of the original building is not exceeded and the cubic content of the original building (as ascertained by external measurement) is not exceeded by more than one-tenth nor the aggregate floor space thereof by more than 500 square metres; (v) the sinking of any boreholes for the purpose of ascertaining the nature of the sub-soil, and the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, as may be necessary in connection therewith; (vi) the erection on operational land of the undertaking, solely for the protection of plant or machinery, of buildings not exceeding 15 metres in height; (vii) any other development carried out on, in or under the operational land of the undertaking except:- (a) the erection, or the reconstruction so as materially to affect the design or external appearance thereof, of buildings; or (b) the installation or erection, by way of addition or replacement, of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height or the height of the plant, machinery, structure or erection so replaced, whichever is the greater. | Facts |
| Documentation url | https://www.legislation.gov.uk/uksi/1977/289/contents/made | Facts |
| Permitted development right part | (E) | Facts |
| Permitted development right class | XVIII | Facts |
Contents
{
"entry-date": "2026-06-10",
"start-date": "1977-03-29",
"end-date": "",
"entity": 11500234,
"name": "Development by statutory undertakers",
"dataset": "permitted-development-right",
"typology": "category",
"reference": "XVIII(E)-1977",
"prefix": "permitted-development-right",
"organisation-entity": "600001",
"geometry": "",
"point": "",
"quality": "some",
"notes": "None",
"description": "Electricity undertakings. Development required for the purpose of the undertaking of any of the following descriptions, that is to say:- (i) the laying underground of pipes, cables or any other apparatus, and the construction of such shafts and tunnels and may be necessary in connection therewith; (ii) the installation in an electric line of feeder or service pillars, or transforming or switching stations or chambers not exceeding (except when constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the installation of service lines to individual consumers from an electric line; (iv) the extension or alteration of buildings on operational land as long as the height of the original building is not exceeded and the cubic content of the original building (as ascertained by external measurement) is not exceeded by more than one-tenth nor the aggregate floor space thereof by more than 500 square metres; (v) the sinking of any boreholes for the purpose of ascertaining the nature of the sub-soil, and the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, as may be necessary in connection therewith; (vi) the erection on operational land of the undertaking, solely for the protection of plant or machinery, of buildings not exceeding 15 metres in height; (vii) any other development carried out on, in or under the operational land of the undertaking except:- (a) the erection, or the reconstruction so as materially to affect the design or external appearance thereof, of buildings; or (b) the installation or erection, by way of addition or replacement, of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height or the height of the plant, machinery, structure or erection so replaced, whichever is the greater.",
"documentation-url": "https://www.legislation.gov.uk/uksi/1977/289/contents/made",
"permitted-development-right-part": "(E)",
"permitted-development-right-class": "XVIII"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.