Skip to main content

This is a new service - your feedback will help us to improve it.

Permitted development right

Development by statutory undertakers

Field Value Fact links
CURIE permitted-development-right:XVIII(E)-1977 no fact link
Prefix permitted-development-right Facts
Reference XVIII(E)-1977 Facts
Name Development by statutory undertakers Facts
Quality Some: We have some data from an alternative source no fact link
Dataset Permitted development right no fact link
Organisation Ministry of Housing, Communities & Local Government no fact link
Start date 1977-03-29 Facts
End date Facts
Entry date 2026-06-10 Facts
Typology category no fact link
Notes None Facts
Description Electricity undertakings. Development required for the purpose of the undertaking of any of the following descriptions, that is to say:- (i) the laying underground of pipes, cables or any other apparatus, and the construction of such shafts and tunnels and may be necessary in connection therewith; (ii) the installation in an electric line of feeder or service pillars, or transforming or switching stations or chambers not exceeding (except when constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the installation of service lines to individual consumers from an electric line; (iv) the extension or alteration of buildings on operational land as long as the height of the original building is not exceeded and the cubic content of the original building (as ascertained by external measurement) is not exceeded by more than one-tenth nor the aggregate floor space thereof by more than 500 square metres; (v) the sinking of any boreholes for the purpose of ascertaining the nature of the sub-soil, and the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, as may be necessary in connection therewith; (vi) the erection on operational land of the undertaking, solely for the protection of plant or machinery, of buildings not exceeding 15 metres in height; (vii) any other development carried out on, in or under the operational land of the undertaking except:- (a) the erection, or the reconstruction so as materially to affect the design or external appearance thereof, of buildings; or (b) the installation or erection, by way of addition or replacement, of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height or the height of the plant, machinery, structure or erection so replaced, whichever is the greater. Facts
Documentation url https://www.legislation.gov.uk/uksi/1977/289/contents/made Facts
Permitted development right part (E) Facts
Permitted development right class XVIII Facts

Contents

{
        "entry-date": "2026-06-10",
        "start-date": "1977-03-29",
        "end-date": "",
        "entity": 11500234,
        "name": "Development by statutory undertakers",
        "dataset": "permitted-development-right",
        "typology": "category",
        "reference": "XVIII(E)-1977",
        "prefix": "permitted-development-right",
        "organisation-entity": "600001",
        "geometry": "",
        "point": "",
        "quality": "some",
        "notes": "None",
        "description": "Electricity undertakings. Development required for the purpose of the undertaking of any of the following descriptions, that is to say:- (i) the laying underground of pipes, cables or any other apparatus, and the construction of such shafts and tunnels and may be necessary in connection therewith; (ii) the installation in an electric line of feeder or service pillars, or transforming or switching stations or chambers not exceeding (except when constructed underground elsewhere than under a highway) 29 cubic metres in capacity; (iii) the installation of service lines to individual consumers from an electric line; (iv) the extension or alteration of buildings on operational land as long as the height of the original building is not exceeded and the cubic content of the original building (as ascertained by external measurement) is not exceeded by more than one-tenth nor the aggregate floor space thereof by more than 500 square metres; (v) the sinking of any boreholes for the purpose of ascertaining the nature of the sub-soil, and the installation of any plant or machinery, or structures or erections of the nature of plant or machinery, as may be necessary in connection therewith; (vi) the erection on operational land of the undertaking, solely for the protection of plant or machinery, of buildings not exceeding 15 metres in height; (vii) any other development carried out on, in or under the operational land of the undertaking except:- (a) the erection, or the reconstruction so as materially to affect the design or external appearance thereof, of buildings; or (b) the installation or erection, by way of addition or replacement, of any plant or machinery, or structures or erections of the nature of plant or machinery, exceeding 15 metres in height or the height of the plant, machinery, structure or erection so replaced, whichever is the greater.",
        "documentation-url": "https://www.legislation.gov.uk/uksi/1977/289/contents/made",
        "permitted-development-right-part": "(E)",
        "permitted-development-right-class": "XVIII"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.