Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Infrastructure project

Tees CCPP

Geographical area

About this entity

Fact links
CURIE infrastructure-project:EN010082 no fact link
Prefix infrastructure-project Facts about Prefix
Reference EN010082 Facts about Reference
Name Tees CCPP Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date 2017-11-22 Facts about Start date
End date Facts about End date
Entry date 2026-10-24 Facts about Entry date
Typology geography no fact link
Geometry MULTIPOLYGON (((-1.131075 54.574182, -1.131799 54.573998, -1.131488 54.573619, -1.131319 54.573382, -1.131232 54.573252, -1.131199 54.573207, -1.13039 54.573405, -1.13034 54.573333, -1.128753 54.573735, -1.128548 54.573461, -1.124601 54.574455, -1.12493 54.574893, -1.122346 54.575555, -1.123859 54.577555, -1.126122 54.576983, -1.126213 54.576965, -1.126265 54.576945, -1.126449 54.576898, -1.126566 54.577059, -1.12708 54.576936, -1.127448 54.576845, -1.127324 54.576675, -1.130189 54.575948, -1.129541 54.575093, -1.131302 54.57465, -1.131129 54.574403, -1.130986 54.574204, -1.131036 54.574193, -1.131075 54.574182))) Facts about Geometry
Point POINT (-1.125289 54.575507) Facts about Point
Description A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections. Facts about Description
Documentation url https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010082 Facts about Documentation url
Infrastructure project type EN01 - Generating Stations Facts about Infrastructure project type
Infrastructure project decision post-decision Facts about Infrastructure project decision

Available Code Snippets:

{
        "entry-date": "2026-10-24",
        "start-date": "2017-11-22",
        "end-date": "",
        "entity": 11100000200,
        "name": "Tees CCPP",
        "dataset": "infrastructure-project",
        "typology": "geography",
        "reference": "EN010082",
        "prefix": "infrastructure-project",
        "organisation-entity": 14,
        "geometry": "MULTIPOLYGON (((-1.131075 54.574182, -1.131799 54.573998, -1.131488 54.573619, -1.131319 54.573382, -1.131232 54.573252, -1.131199 54.573207, -1.13039 54.573405, -1.13034 54.573333, -1.128753 54.573735, -1.128548 54.573461, -1.124601 54.574455, -1.12493 54.574893, -1.122346 54.575555, -1.123859 54.577555, -1.126122 54.576983, -1.126213 54.576965, -1.126265 54.576945, -1.126449 54.576898, -1.126566 54.577059, -1.12708 54.576936, -1.127448 54.576845, -1.127324 54.576675, -1.130189 54.575948, -1.129541 54.575093, -1.131302 54.57465, -1.131129 54.574403, -1.130986 54.574204, -1.131036 54.574193, -1.131075 54.574182)))",
        "point": "POINT (-1.125289 54.575507)",
        "quality": "authoritative",
        "description": "A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections.",
        "documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010082",
        "infrastructure-project-type": "EN01 - Generating Stations",
        "infrastructure-project-decision": "post-decision"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.