Infrastructure project
Tees CCPP
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | infrastructure-project:EN010082 | no fact link |
| Prefix | infrastructure-project | Facts about Prefix |
| Reference | EN010082 | Facts about Reference |
| Name | Tees CCPP | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Infrastructure project | no fact link |
| Organisation | Planning Inspectorate | no fact link |
| Start date | 2017-11-22 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2026-10-24 | Facts about Entry date |
| Typology | geography | no fact link |
| Geometry |
MULTIPOLYGON (((-1.131075 54.574182, -1.131799 54.573998, -1.131488 54.573619, -1.131319 54.573382, -1.131232 54.573252, -1.131199 54.573207, -1.13039 54.573405, -1.13034 54.573333, -1.128753 54.573735, -1.128548 54.573461, -1.124601 54.574455, -1.12493 54.574893, -1.122346 54.575555, -1.123859 54.577555, -1.126122 54.576983, -1.126213 54.576965, -1.126265 54.576945, -1.126449 54.576898, -1.126566 54.577059, -1.12708 54.576936, -1.127448 54.576845, -1.127324 54.576675, -1.130189 54.575948, -1.129541 54.575093, -1.131302 54.57465, -1.131129 54.574403, -1.130986 54.574204, -1.131036 54.574193, -1.131075 54.574182)))
|
Facts about Geometry |
| Point |
POINT (-1.125289 54.575507)
|
Facts about Point |
| Description | A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections. | Facts about Description |
| Documentation url | https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010082 | Facts about Documentation url |
| Infrastructure project type | EN01 - Generating Stations | Facts about Infrastructure project type |
| Infrastructure project decision | post-decision | Facts about Infrastructure project decision |
Available Code Snippets:
{
"entry-date": "2026-10-24",
"start-date": "2017-11-22",
"end-date": "",
"entity": 11100000200,
"name": "Tees CCPP",
"dataset": "infrastructure-project",
"typology": "geography",
"reference": "EN010082",
"prefix": "infrastructure-project",
"organisation-entity": 14,
"geometry": "MULTIPOLYGON (((-1.131075 54.574182, -1.131799 54.573998, -1.131488 54.573619, -1.131319 54.573382, -1.131232 54.573252, -1.131199 54.573207, -1.13039 54.573405, -1.13034 54.573333, -1.128753 54.573735, -1.128548 54.573461, -1.124601 54.574455, -1.12493 54.574893, -1.122346 54.575555, -1.123859 54.577555, -1.126122 54.576983, -1.126213 54.576965, -1.126265 54.576945, -1.126449 54.576898, -1.126566 54.577059, -1.12708 54.576936, -1.127448 54.576845, -1.127324 54.576675, -1.130189 54.575948, -1.129541 54.575093, -1.131302 54.57465, -1.131129 54.574403, -1.130986 54.574204, -1.131036 54.574193, -1.131075 54.574182)))",
"point": "POINT (-1.125289 54.575507)",
"quality": "authoritative",
"description": "A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections.",
"documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010082",
"infrastructure-project-type": "EN01 - Generating Stations",
"infrastructure-project-decision": "post-decision"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.