{"geometry":{"type":"MultiPolygon","coordinates":[[[[-1.131075,54.574182],[-1.131799,54.573998],[-1.131488,54.573619],[-1.131319,54.573382],[-1.131232,54.573252],[-1.131199,54.573207],[-1.13039,54.573405],[-1.13034,54.573333],[-1.128753,54.573735],[-1.128548,54.573461],[-1.124601,54.574455],[-1.12493,54.574893],[-1.122346,54.575555],[-1.123859,54.577555],[-1.126122,54.576983],[-1.126213,54.576965],[-1.126265,54.576945],[-1.126449,54.576898],[-1.126566,54.577059],[-1.12708,54.576936],[-1.127448,54.576845],[-1.127324,54.576675],[-1.130189,54.575948],[-1.129541,54.575093],[-1.131302,54.57465],[-1.131129,54.574403],[-1.130986,54.574204],[-1.131036,54.574193],[-1.131075,54.574182]]]]},"type":"Feature","properties":{"entry-date":"2026-10-24","start-date":"2017-11-22","end-date":"","entity":11100000200,"name":"Tees CCPP","dataset":"infrastructure-project","typology":"geography","reference":"EN010082","prefix":"infrastructure-project","organisation-entity":14,"quality":"authoritative","description":"A gas fired combined cycle gas turbine (CCGT) power station with a maximum generating capacity of up to 1,700 MWe (Tbc). The project will utilise existing Gas and National Grid connections.","documentation-url":"https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010082","infrastructure-project-type":"EN01 - Generating Stations","infrastructure-project-decision":"post-decision"}}