Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Infrastructure project

Kentish Flats Extension

Geographical area

About this entity

Fact links
CURIE infrastructure-project:EN010036 no fact link
Prefix infrastructure-project Facts about Prefix
Reference EN010036 Facts about Reference
Name Kentish Flats Extension Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date 2011-10-14 Facts about Start date
End date Facts about End date
Entry date 2026-10-24 Facts about Entry date
Typology geography no fact link
Geometry MULTIPOLYGON (((1.053833 51.4685, 1.032747 51.466378, 1.068158 51.43819, 1.092458 51.440634, 1.090752 51.376024, 1.098957 51.372197, 1.099746 51.372176, 1.099735 51.372008, 1.100448 51.371825, 1.10141 51.371668, 1.101919 51.371632, 1.103692 51.376333, 1.105417 51.441932, 1.142399 51.44564, 1.134 51.452333, 1.080833 51.447, 1.053833 51.4685))) Facts about Geometry
Point POINT (1.096076 51.417082) Facts about Point
Description The proposed development comprises the erection of 10 to 17 wind turbines with a maximum tip height of 145 metres, monopile foundations, and underwater cabling to connect the turbines together and to export the electricity generated. The export cables will come ashore close to Hampton Pier where they will connect to the onshore underground electricity cables in a transition pit. A full list of the works that are comprised in the proposed development is contained within the Project Design Statement (Document 7.2). Facts about Description
Documentation url https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010036 Facts about Documentation url
Infrastructure project type EN01 - Generating Stations Facts about Infrastructure project type
Infrastructure project decision post-decision Facts about Infrastructure project decision

Available Code Snippets:

{
        "entry-date": "2026-10-24",
        "start-date": "2011-10-14",
        "end-date": "",
        "entity": 11100000123,
        "name": "Kentish Flats Extension",
        "dataset": "infrastructure-project",
        "typology": "geography",
        "reference": "EN010036",
        "prefix": "infrastructure-project",
        "organisation-entity": 14,
        "geometry": "MULTIPOLYGON (((1.053833 51.4685, 1.032747 51.466378, 1.068158 51.43819, 1.092458 51.440634, 1.090752 51.376024, 1.098957 51.372197, 1.099746 51.372176, 1.099735 51.372008, 1.100448 51.371825, 1.10141 51.371668, 1.101919 51.371632, 1.103692 51.376333, 1.105417 51.441932, 1.142399 51.44564, 1.134 51.452333, 1.080833 51.447, 1.053833 51.4685)))",
        "point": "POINT (1.096076 51.417082)",
        "quality": "authoritative",
        "description": "The proposed development comprises the erection of 10 to 17 wind turbines with a maximum tip height of 145 metres, monopile foundations, and underwater cabling to connect the turbines together and to export the electricity generated. The export cables will come ashore close to Hampton Pier where they will connect to the onshore underground electricity cables in a transition pit. A full list of the works that are comprised in the proposed development is contained within the Project Design Statement (Document 7.2).",
        "documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010036",
        "infrastructure-project-type": "EN01 - Generating Stations",
        "infrastructure-project-decision": "post-decision"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.