{"geometry":{"type":"MultiPolygon","coordinates":[[[[1.053833,51.4685],[1.032747,51.466378],[1.068158,51.43819],[1.092458,51.440634],[1.090752,51.376024],[1.098957,51.372197],[1.099746,51.372176],[1.099735,51.372008],[1.100448,51.371825],[1.10141,51.371668],[1.101919,51.371632],[1.103692,51.376333],[1.105417,51.441932],[1.142399,51.44564],[1.134,51.452333],[1.080833,51.447],[1.053833,51.4685]]]]},"type":"Feature","properties":{"entry-date":"2026-10-24","start-date":"2011-10-14","end-date":"","entity":11100000123,"name":"Kentish Flats Extension","dataset":"infrastructure-project","typology":"geography","reference":"EN010036","prefix":"infrastructure-project","organisation-entity":14,"quality":"authoritative","description":"The proposed development comprises the erection of 10 to 17 wind turbines with a maximum tip height of 145 metres, monopile foundations, and underwater cabling to connect the turbines together and to export the electricity generated. The export cables will come ashore close to Hampton Pier where they will connect to the onshore underground electricity cables in a transition pit. A full list of the works that are comprised in the proposed development is contained within the Project Design Statement (Document 7.2).","documentation-url":"https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010036","infrastructure-project-type":"EN01 - Generating Stations","infrastructure-project-decision":"post-decision"}}