Planning condition
Battery Safety Management Plan (BSMP)
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0127516 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0127516 | Facts |
| Name | Battery Safety Management Plan (BSMP) | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To ensure that adequate management controls are put into place by the operator in accordance with Policies 46, 47, 57 and 58 of the Local Plan. | Facts |
| Description | Prior to first use of any part of the development hereby approved, a Battery Safety Management Plan (BSMP) shall be submitted to, and approved in writing by, the local planning authority. The BSMP must prescribe measures to facilitate safety during the construction, operation and decommissioning of the battery storage system, including potential risks from battery fire, theft and flooding. The BSMP shall be informed by a detailed Site-Specific Risk Information (SSRI) or other such assessment in consultation with the South Yorkshire Fire and Rescue Service and South Yorkshire Police. The SSRI shall include: Site layout including all access points; Any building overview including size, construction details, operations/use, any internal hazards (i.e compressed gas), service isolation points and contact numbers Identify presence of any automatic firefighting equipment (i.e. fire suppression) External hazards including distances to nearby hazards, hydrant locations and emergency access points Identification of any hazardous substances CCTV Camera Locations The BSMP shall be implemented in accordance with the agreed details at all times. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73003147,
"name": "Battery Safety Management Plan (BSMP)",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0127516",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To ensure that adequate management controls are put into place by the operator in accordance with Policies 46, 47, 57 and 58 of the Local Plan.",
"description": "Prior to first use of any part of the development hereby approved, a Battery Safety Management Plan (BSMP) shall be submitted to, and approved in writing by, the local planning authority. The BSMP must prescribe measures to facilitate safety during the construction, operation and decommissioning of the battery storage system, including potential risks from battery fire, theft and flooding. The BSMP shall be informed by a detailed Site-Specific Risk Information (SSRI) or other such assessment in consultation with the South Yorkshire Fire and Rescue Service and South Yorkshire Police. The SSRI shall include: Site layout including all access points; Any building overview including size, construction details, operations/use, any internal hazards (i.e compressed gas), service isolation points and contact numbers Identify presence of any automatic firefighting equipment (i.e. fire suppression) External hazards including distances to nearby hazards, hydrant locations and emergency access points Identification of any hazardous substances CCTV Camera Locations The BSMP shall be implemented in accordance with the agreed details at all times."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.