Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

Ecology - Precom - CEMP

About this entity

Fact links
CURIE planning-condition:U0127510 no fact link
Prefix planning-condition Facts
Reference U0127510 Facts
Name Ecology - Precom - CEMP Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset. Facts
Description Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include all recommendations set out in the submitted Preliminary Ecological Appraisal (PEA) and Ecological Impact Assessment (EcIA). The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Training required for personnel dealing with spillages and spill kits available on site. 3. Details of maintenance regime for the installed equipment to check for drips and spills. 4. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA 7. A method statement for the survey and protection of badgers 8. A sensitive lighting scheme to reduce night sky illumination and to protect commuting and foraging bats The development shall then be carried out in accordance with the agreed details. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73003141,
        "name": "Ecology - Precom - CEMP",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0127510",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.",
        "description": "Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include all recommendations set out in the submitted Preliminary Ecological Appraisal (PEA) and Ecological Impact Assessment (EcIA). The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Training required for personnel dealing with spillages and spill kits available on site. 3. Details of maintenance regime for the installed equipment to check for drips and spills. 4. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA 7. A method statement for the survey and protection of badgers 8. A sensitive lighting scheme to reduce night sky illumination and to protect commuting and foraging bats The development shall then be carried out in accordance with the agreed details."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.