Planning condition

Method Statements

About this entity

Fact links
CURIE planning-condition:U0120422 no fact link
Prefix planning-condition Facts
Reference U0120422 Facts
Name Method Statements Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason In the interest of railway safety. Facts
Description Prior to the commencement of development, a Method Statement relating to works adjacent the railway boundary shall be submitted to and approved in writing by the local planning authority. This should include an outline of the proposed method of construction, risk assessment in relation to the railway and construction traffic management plan. Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried out in a fail-safe manner, it will be necessary to restrict those works to periods when the railway is closed to rail traffic i.e. possession which must be booked via Network Rail's Asset Protection Project Manager and are subject to a minimum prior notice period for booking of 20 weeks. If excavations/piling/buildings are to be located within 10m of the railway boundary a method statement should be submitted for approval by NR. The works shall be carried out in accordance with the approved details. Once planning permission has been granted and at least six weeks prior to works commencing on site the Asset Protection Project Manager (OPE) MUST be contacted by the developer. The OPE will require to see any method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works to be carried out on site that may affect the safety, operation, integrity and access to the railway. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002620,
        "name": "Method Statements",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0120422",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "In the interest of railway safety.",
        "description": "Prior to the commencement of development, a Method Statement relating to works adjacent the railway boundary shall be submitted to and approved in writing by the local planning authority. This should include an outline of the proposed method of construction, risk assessment in relation to the railway and construction traffic management plan. Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried out in a fail-safe manner, it will be necessary to restrict those works to periods when the railway is closed to rail traffic i.e. possession which must be booked via Network Rail's Asset Protection Project Manager and are subject to a minimum prior notice period for booking of 20 weeks. If excavations/piling/buildings are to be located within 10m of the railway boundary a method statement should be submitted for approval by NR. The works shall be carried out in accordance with the approved details. Once planning permission has been granted and at least six weeks prior to works commencing on site the Asset Protection Project Manager (OPE) MUST be contacted by the developer. The OPE will require to see any method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works to be carried out on site that may affect the safety, operation, integrity and access to the railway.",
        "organisation-curie": "local-authority:DNC"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.