Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Planning condition

EA

About this entity

Fact links
CURIE planning-condition:U0118455 no fact link
Prefix planning-condition Facts about Prefix
Reference U0118455 Facts about Reference
Name EA Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts about Start date
End date Facts about End date
Entry date 2025-06-21 Facts about Entry date
Typology policy no fact link
Notes Unique Condition Facts about Notes
Reason To reduce the risk of flooding to the proposed development and future occupants, To ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment, Consider how people will be kept safe from the identified flood hazards, Provide an adequate finished floor level for the development. The Environment Agency highlight that there were significant errors in original FRA (03/04/2022) and, following our reported concerns to the local planning authority, R.P.M. Draughting Ltd. submitted a revised assessment that includes the above details. Facts about Reason
Description The development shall be carried out in accordance with the revised flood risk assessment (09/10/2023), that was submitted by R.P.M. Draughting Limited, and including the following mitigation measures that it details in section 5: o Finished ground floor levels shall be set no lower than 4.4 metres above Ordnance Datum (AOD), o There shall be no sleeping accommodation located on the ground floor of the development, o Flood resilience measures will be incorporated, with the ground floor being tiled or water compatible coverings as stated in section 5.0 of the Flood Risk Assessment (FRA), o All electrical sockets will be located 450mm above the finished floor level as stated in section 5.3 of the FRA, o Services pipes or ducts that penetrate the building to be located above finished floor levels. These mitigation measures shall be fully implemented prior to and during occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts about Description

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73008707,
        "name": "EA",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0118455",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants, To ensure the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment, Consider how people will be kept safe from the identified flood hazards, Provide an adequate finished floor level for the development. The Environment Agency highlight that there were significant errors in original FRA (03/04/2022) and, following our reported concerns to the local planning authority, R.P.M. Draughting Ltd. submitted a revised assessment that includes the above details.",
        "description": "The development shall be carried out in accordance with the revised flood risk assessment (09/10/2023), that was submitted by R.P.M. Draughting Limited, and including the following mitigation measures that it details in section 5: o Finished ground floor levels shall be set no lower than 4.4 metres above Ordnance Datum (AOD), o There shall be no sleeping accommodation located on the ground floor of the development, o Flood resilience measures will be incorporated, with the ground floor being tiled or water compatible coverings as stated in section 5.0 of the Flood Risk Assessment (FRA), o All electrical sockets will be located 450mm above the finished floor level as stated in section 5.3 of the FRA, o Services pipes or ducts that penetrate the building to be located above finished floor levels. These mitigation measures shall be fully implemented prior to and during occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.