Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

CTMP

About this entity

Fact links
CURIE planning-condition:U0117195 no fact link
Prefix planning-condition Facts
Reference U0117195 Facts
Name CTMP Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To safeguard the living conditions of neighbouring residents and in the interests of highway safety in accordance with Local Plan Policy 13 Facts
Description No development shall commence on site until a Construction Traffic Management Plan (CTMP) is submitted to and approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. As a minimum, the CTMP shall contain information relating to (but not limited to): i. The site compound and parking of vehicles for site operatives and visitors. ii. The erection and maintenance of security hoarding around the development including decorative displays and facilities for public viewing including traffic management measures in order to erect the hoarding and all approved licences in order to erect hoarding. iii. A scheme for recycling/disposing of waste resulting from demolition and construction works. iv. Storage of plant and materials used in demolition/construction of the development. v. Measures to control noise and the emission of dust and dirt during demolition/construction. vi. Wheel washing facilities designated on hard standing areas within the site. vii. Volumes and types of construction vehicles. viii. Identification of delivery routes and timing of deliveries; ix. Identification of agreed access point and all Temporary signage on the adopted highway x. Contractors method for controlling construction traffic and adherence to routes xi. Loading and unloading of plant and materials including any temporary traffic management measures needed i.e. Road/Lane closures, footpath closures etc xii. Size, route and numbers of abnormal loads xiii. Swept path analysis (as required) xiv. Construction Period Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002136,
        "name": "CTMP",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0117195",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To safeguard the living conditions of neighbouring residents and in the interests of highway safety in accordance with Local Plan Policy 13",
        "description": "No development shall commence on site until a Construction Traffic Management Plan (CTMP) is submitted to and approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. As a minimum, the CTMP shall contain information relating to (but not limited to): i. The site compound and parking of vehicles for site operatives and visitors. ii. The erection and maintenance of security hoarding around the development including decorative displays and facilities for public viewing including traffic management measures in order to erect the hoarding and all approved licences in order to erect hoarding. iii. A scheme for recycling/disposing of waste resulting from demolition and construction works. iv. Storage of plant and materials used in demolition/construction of the development. v. Measures to control noise and the emission of dust and dirt during demolition/construction. vi. Wheel washing facilities designated on hard standing areas within the site. vii. Volumes and types of construction vehicles. viii. Identification of delivery routes and timing of deliveries; ix. Identification of agreed access point and all Temporary signage on the adopted highway x. Contractors method for controlling construction traffic and adherence to routes xi. Loading and unloading of plant and materials including any temporary traffic management measures needed i.e. Road/Lane closures, footpath closures etc xii. Size, route and numbers of abnormal loads xiii. Swept path analysis (as required) xiv. Construction Period",
        "organisation-curie": "local-authority:DNC"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.