Infrastructure project
Slough Multifuel Extension Project
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | infrastructure-project:EN010129 | no fact link |
| Prefix | infrastructure-project | Facts about Prefix |
| Reference | EN010129 | Facts about Reference |
| Name | Slough Multifuel Extension Project | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Infrastructure project | no fact link |
| Organisation | Planning Inspectorate | no fact link |
| Start date | 2022-09-30 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2026-10-24 | Facts about Entry date |
| Typology | geography | no fact link |
| Geometry |
MULTIPOLYGON (((-0.628351 51.524211, -0.628126 51.524669, -0.628122 51.524674, -0.628108 51.524685, -0.628089 51.524694, -0.628068 51.524699, -0.628056 51.5247, -0.62804 51.5247, -0.628024 51.524697, -0.628201 51.524737, -0.628373 51.524775, -0.628355 51.524769, -0.628344 51.524763, -0.628328 51.524749, -0.628323 51.524742, -0.62832 51.524734, -0.628319 51.524718, -0.62848 51.524393, -0.62879 51.523777, -0.627905 51.523603, -0.627944 51.523525, -0.627094 51.523357, -0.626897 51.523306, -0.626755 51.523275, -0.6264 51.523205, -0.626424 51.523157, -0.626073 51.523086, -0.626069 51.52301, -0.626418 51.522927, -0.626401 51.522884, -0.62635 51.522894, -0.625987 51.522934, -0.625988 51.522942, -0.625756 51.522964, -0.625605 51.522933, -0.625472 51.523192, -0.625806 51.52326, -0.625585 51.52369, -0.62558 51.523702, -0.625262 51.523639, -0.625111 51.523929, -0.62509 51.524001, -0.625091 51.524011, -0.625101 51.524045, -0.625107 51.524055, -0.625121 51.52407, -0.625132 51.524078, -0.625159 51.524089, -0.625635 51.524184, -0.625552 51.524364, -0.625639 51.524383, -0.625605 51.524445, -0.625516 51.524426, -0.625278 51.524853, -0.626042 51.525008, -0.626078 51.524979, -0.626144 51.52499, -0.626271 51.524717, -0.626205 51.524672, -0.626268 51.524635, -0.626327 51.524674, -0.626386 51.524645, -0.626388 51.524647, -0.626437 51.524625, -0.626494 51.524514, -0.626734 51.524562, -0.626989 51.52406, -0.627749 51.524204, -0.627803 51.5241, -0.628351 51.524211)))
|
Facts about Geometry |
| Point |
POINT (-0.627751 51.523485)
|
Facts about Point |
| Description | The extension of a multifuel combined heat and power (CHP) electricity generating station from up to 50 megawatts (MW) gross output to up to 60 MW gross output, comprising the following engineering operations: installation of primary and secondary air preheating systems to the boilers to increase the thermal efficiency of the generating station, including heat exchanger bundles, pipework, valves, pipe supports, thermal insulation, instrumentation, cabling and containment; mechanical modifications to the steam turbine inlet control valve to increase the steam capacity and to the turbine control system and distributed control system software to allow for an increase in the gross output of the generating station; and associated development. | Facts about Description |
| Documentation url | https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010129 | Facts about Documentation url |
| Infrastructure project type | EN01 - Generating Stations | Facts about Infrastructure project type |
| Infrastructure project decision | post-decision | Facts about Infrastructure project decision |
Available Code Snippets:
{
"entry-date": "2026-10-24",
"start-date": "2022-09-30",
"end-date": "",
"entity": 11100000191,
"name": "Slough Multifuel Extension Project",
"dataset": "infrastructure-project",
"typology": "geography",
"reference": "EN010129",
"prefix": "infrastructure-project",
"organisation-entity": 14,
"geometry": "MULTIPOLYGON (((-0.628351 51.524211, -0.628126 51.524669, -0.628122 51.524674, -0.628108 51.524685, -0.628089 51.524694, -0.628068 51.524699, -0.628056 51.5247, -0.62804 51.5247, -0.628024 51.524697, -0.628201 51.524737, -0.628373 51.524775, -0.628355 51.524769, -0.628344 51.524763, -0.628328 51.524749, -0.628323 51.524742, -0.62832 51.524734, -0.628319 51.524718, -0.62848 51.524393, -0.62879 51.523777, -0.627905 51.523603, -0.627944 51.523525, -0.627094 51.523357, -0.626897 51.523306, -0.626755 51.523275, -0.6264 51.523205, -0.626424 51.523157, -0.626073 51.523086, -0.626069 51.52301, -0.626418 51.522927, -0.626401 51.522884, -0.62635 51.522894, -0.625987 51.522934, -0.625988 51.522942, -0.625756 51.522964, -0.625605 51.522933, -0.625472 51.523192, -0.625806 51.52326, -0.625585 51.52369, -0.62558 51.523702, -0.625262 51.523639, -0.625111 51.523929, -0.62509 51.524001, -0.625091 51.524011, -0.625101 51.524045, -0.625107 51.524055, -0.625121 51.52407, -0.625132 51.524078, -0.625159 51.524089, -0.625635 51.524184, -0.625552 51.524364, -0.625639 51.524383, -0.625605 51.524445, -0.625516 51.524426, -0.625278 51.524853, -0.626042 51.525008, -0.626078 51.524979, -0.626144 51.52499, -0.626271 51.524717, -0.626205 51.524672, -0.626268 51.524635, -0.626327 51.524674, -0.626386 51.524645, -0.626388 51.524647, -0.626437 51.524625, -0.626494 51.524514, -0.626734 51.524562, -0.626989 51.52406, -0.627749 51.524204, -0.627803 51.5241, -0.628351 51.524211)))",
"point": "POINT (-0.627751 51.523485)",
"quality": "authoritative",
"description": "The extension of a multifuel combined heat and power (CHP) electricity generating station from up to 50 megawatts (MW) gross output to up to 60 MW gross output, comprising the following engineering operations: installation of primary and secondary air preheating systems to the boilers to increase the thermal efficiency of the generating station, including heat exchanger bundles, pipework, valves, pipe supports, thermal insulation, instrumentation, cabling and containment; mechanical modifications to the steam turbine inlet control valve to increase the steam capacity and to the turbine control system and distributed control system software to allow for an increase in the gross output of the generating station; and associated development.",
"documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010129",
"infrastructure-project-type": "EN01 - Generating Stations",
"infrastructure-project-decision": "post-decision"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.