Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Infrastructure project

Morecambe Offshore Windfarm Generation Assets

Geographical area

About this entity

Fact links
CURIE infrastructure-project:EN010121 no fact link
Prefix infrastructure-project Facts about Prefix
Reference EN010121 Facts about Reference
Name Morecambe Offshore Windfarm Generation Assets Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Infrastructure project no fact link
Organisation Planning Inspectorate no fact link
Start date 2024-05-31 Facts about Start date
End date Facts about End date
Entry date 2026-10-24 Facts about Entry date
Typology geography no fact link
Geometry MULTIPOLYGON (((-3.608795 53.836387, -3.681637 53.77942, -3.601334 53.750204, -3.494018 53.754659, -3.496669 53.829196, -3.571027 53.828245, -3.608795 53.836387))) Facts about Geometry
Point POINT (-3.607784 53.799752) Facts about Point
Description The Generation Assets of the Morecambe Offshore Windfarm, including fixed foundation wind turbine generators, inter-array cables, offshore substation platform(s) and possible platform link cables to connect offshore substations. The offshore windfarm site is located in the eastern Irish Sea, in water depths of 18-40m. The windfarm has an expected nominal capacity of 480MW. The offshore windfarm site is situated in the vicinity of the South Morecambe Gas Fields (which are currently expected to cease production around 2027 (+/-2 years)). An important factor in the windfarm site’s selection was the potential for the project to be the first windfarm to fully co-exist with oil and gas operations on previously developed seabed. The offshore windfarm site was selected as part of The Crown Estate’s Offshore Wind Leasing Round 4. Several operational windfarms are located near the site. Two larger Round 4 offshore windfarms are also planned to the west of the site. The Morecambe offshore windfarm t will help achieve the UK Government’s commitment to net zero by 2050 and tackle the climate emergency by producing electricity from renewable energy. Facts about Description
Documentation url https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010121 Facts about Documentation url
Infrastructure project type EN01 - Generating Stations Facts about Infrastructure project type
Infrastructure project decision post-decision Facts about Infrastructure project decision

Available Code Snippets:

{
        "entry-date": "2026-10-24",
        "start-date": "2024-05-31",
        "end-date": "",
        "entity": 11100000009,
        "name": "Morecambe Offshore Windfarm Generation Assets",
        "dataset": "infrastructure-project",
        "typology": "geography",
        "reference": "EN010121",
        "prefix": "infrastructure-project",
        "organisation-entity": 14,
        "geometry": "MULTIPOLYGON (((-3.608795 53.836387, -3.681637 53.77942, -3.601334 53.750204, -3.494018 53.754659, -3.496669 53.829196, -3.571027 53.828245, -3.608795 53.836387)))",
        "point": "POINT (-3.607784 53.799752)",
        "quality": "authoritative",
        "description": "The Generation Assets of the Morecambe Offshore Windfarm, including fixed foundation wind turbine generators, inter-array cables, offshore substation platform(s) and possible platform link cables to connect offshore substations. The offshore windfarm site is located in the eastern Irish Sea, in water depths of 18-40m. The windfarm has an expected nominal capacity of 480MW. The offshore windfarm site is situated in the vicinity of the South Morecambe Gas Fields (which are currently expected to cease production around 2027 (+/-2 years)). An important factor in the windfarm site\u2019s selection was the potential for the project to be the first windfarm to fully co-exist with oil and gas operations on previously developed seabed. The offshore windfarm site was selected as part of The Crown Estate\u2019s Offshore Wind Leasing Round 4. Several operational windfarms are located near the site. Two larger Round 4 offshore windfarms are also planned to the west of the site. The Morecambe offshore windfarm t will help achieve the UK Government\u2019s commitment to net zero by 2050 and tackle the climate emergency by producing electricity from renewable energy.",
        "documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010121",
        "infrastructure-project-type": "EN01 - Generating Stations",
        "infrastructure-project-decision": "post-decision"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.