Infrastructure project
Morecambe Offshore Windfarm Generation Assets
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | infrastructure-project:EN010121 | no fact link |
| Prefix | infrastructure-project | Facts about Prefix |
| Reference | EN010121 | Facts about Reference |
| Name | Morecambe Offshore Windfarm Generation Assets | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Infrastructure project | no fact link |
| Organisation | Planning Inspectorate | no fact link |
| Start date | 2024-05-31 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2026-10-24 | Facts about Entry date |
| Typology | geography | no fact link |
| Geometry |
MULTIPOLYGON (((-3.608795 53.836387, -3.681637 53.77942, -3.601334 53.750204, -3.494018 53.754659, -3.496669 53.829196, -3.571027 53.828245, -3.608795 53.836387)))
|
Facts about Geometry |
| Point |
POINT (-3.607784 53.799752)
|
Facts about Point |
| Description | The Generation Assets of the Morecambe Offshore Windfarm, including fixed foundation wind turbine generators, inter-array cables, offshore substation platform(s) and possible platform link cables to connect offshore substations. The offshore windfarm site is located in the eastern Irish Sea, in water depths of 18-40m. The windfarm has an expected nominal capacity of 480MW. The offshore windfarm site is situated in the vicinity of the South Morecambe Gas Fields (which are currently expected to cease production around 2027 (+/-2 years)). An important factor in the windfarm site’s selection was the potential for the project to be the first windfarm to fully co-exist with oil and gas operations on previously developed seabed. The offshore windfarm site was selected as part of The Crown Estate’s Offshore Wind Leasing Round 4. Several operational windfarms are located near the site. Two larger Round 4 offshore windfarms are also planned to the west of the site. The Morecambe offshore windfarm t will help achieve the UK Government’s commitment to net zero by 2050 and tackle the climate emergency by producing electricity from renewable energy. | Facts about Description |
| Documentation url | https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010121 | Facts about Documentation url |
| Infrastructure project type | EN01 - Generating Stations | Facts about Infrastructure project type |
| Infrastructure project decision | post-decision | Facts about Infrastructure project decision |
Available Code Snippets:
{
"entry-date": "2026-10-24",
"start-date": "2024-05-31",
"end-date": "",
"entity": 11100000009,
"name": "Morecambe Offshore Windfarm Generation Assets",
"dataset": "infrastructure-project",
"typology": "geography",
"reference": "EN010121",
"prefix": "infrastructure-project",
"organisation-entity": 14,
"geometry": "MULTIPOLYGON (((-3.608795 53.836387, -3.681637 53.77942, -3.601334 53.750204, -3.494018 53.754659, -3.496669 53.829196, -3.571027 53.828245, -3.608795 53.836387)))",
"point": "POINT (-3.607784 53.799752)",
"quality": "authoritative",
"description": "The Generation Assets of the Morecambe Offshore Windfarm, including fixed foundation wind turbine generators, inter-array cables, offshore substation platform(s) and possible platform link cables to connect offshore substations. The offshore windfarm site is located in the eastern Irish Sea, in water depths of 18-40m. The windfarm has an expected nominal capacity of 480MW. The offshore windfarm site is situated in the vicinity of the South Morecambe Gas Fields (which are currently expected to cease production around 2027 (+/-2 years)). An important factor in the windfarm site\u2019s selection was the potential for the project to be the first windfarm to fully co-exist with oil and gas operations on previously developed seabed. The offshore windfarm site was selected as part of The Crown Estate\u2019s Offshore Wind Leasing Round 4. Several operational windfarms are located near the site. Two larger Round 4 offshore windfarms are also planned to the west of the site. The Morecambe offshore windfarm t will help achieve the UK Government\u2019s commitment to net zero by 2050 and tackle the climate emergency by producing electricity from renewable energy.",
"documentation-url": "https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010121",
"infrastructure-project-type": "EN01 - Generating Stations",
"infrastructure-project-decision": "post-decision"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.