Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
47fb16fbfe6946efc68f54766dc100d9d40a4a3ffd9173311e80ad36122bf568 description The site shall be developed with separate systems of drainage for foul and surface water on and off the site. Surface water from the entire site shall be restricted to a maximum rate of 3.5 litres per second, to the public surface water sewer network. 2025-06-21