Fact Field Value Latest Entry Date
2a8ba278551a63e0ba1999f9dc83aeffaa8d573ac55cb212158c1735429ec256 description The development shall be carried out in accordance with the submitted flood risk assessment (unreferenced, dated 17th November 2023 and complied by Howard J Wroot) and the following mitigation measures it details: There shall be a 9 metre easement provided between the tackle shop/WC/ and the top of bank of the Woodhouse Sewer (which is often referred to as the 'Diggin Dyke' throughout the application). Finished floor levels shall be set no lower than 3.1 metres above Ordnance Datum (AOD) as per section 5.5 of the FRA Flood resilience measures should be incorporated into the development as detailed within Section 5.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21