Fact Field Value Latest Entry Date
728f30d665526f7edc6410edbe14f05456325bb862f82a506ed496fec1017ef9 description The development shall be carried out in accordance with the submitted Flood Risk Assessment (FRA) prepared by J Roberts Design Ltd, reference 3926, dated February 2024, and the following mitigation measures it details: - The building shall feature two storeys; - Flood resilience measures shall be implemented as described on page 18 of the FRA; and - Ground floor finished floor levels shall be set no lower than the existing levels on site. These mitigation measures shall be fully implemented prior to the first use of the development. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21