Fact Field Value Latest Entry Date
9b7d76cca882f7db856a60dfee4651021f07e5f914698150c7fceaa228a45b43 description The development shall be carried out in accordance with the approved flood risk assessment and site plans and the following mitigation measures they detail: - Finished floor levels shall be set no lower than existing - As per the submitted floor plans (Drawing 001, Sept 2023, 23/161) there shall be no ground floor sleeping acommodation These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21