cc830cadb029d98787fcd7dfd7b5d9323b5ba3277ec4d000a9181dc87b349d18 description The development shall be carried out in accordance with the approved Flood Risk and Sequential Test Assessment (dated 17 July 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 4.4metres above Ordnance Datum (AOD). These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21