Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
a49d03ba890d912692264140666af056c6c805dbd8a1178cd2e05ff52ee0961e description Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing. 2025-06-21