Flood details

Provenance

Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
e567b29c4885c2ae56953d36322e904ad2a8b5e9c75d8e523890a84e82f436b3 description The development hereby approved shall be carried out in accordance with the submitted flood risk assessment (Flood Plan Limited 2024) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 6.32 metres above Ordnance Datum (AOD); - Flood resistance and resilience measures shall be installed as per Section 7.0 of the submitted Flood Risk Assessment. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21