| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| f8bf050a9f1067ae0e05475480d170db7bf1f5e1a19cbad2e270a2f24aa275c3 | description | The development shall be carried out in accordance with the submitted flood risk assessment (ref 23018-FRA-001 Rev C / Dart Engineers Ltd / Rec'd December 2023 ) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 5.67 metres above Ordnance Datum (AOD) o Flood resistance and resilience measures will be included as stated within Section 3 of the submitted FRA These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | 2025-06-21 |