FRA Compliance

Provenance

Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
3b334e61dae4b59c8cecfd6e19dc2b0715251e45c65c8d5cb9cbffdef5f3881e description The development shall be carried out in accordance with the submitted flood risk assessment by Met Engineers Ltd, referenced P23-01098 Revision 00, dated November 2023 and the following mitigation measures it details: - Finished floor levels shall be set no lower than existing. - There shall be no increase in building footprint as a result of the change of use. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21