In accordance with specified plans
Provenance
1 result
Fields:
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 9594548d71c7ecb76b40536f0d43575c4030ff7d11f5b23ef0e54a2d38a40c68 | description | The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Drawing no. 1B - ASHP Site Block Plan - Drawing no. 7A - ASHP/Solar Proposal (Locations) Site Plan - Drawing no. 2A - PV Panels specification - ValkPVplanner Project Report, 15.09.023 - ASHP specification - Daikin heating solution report - Noise Impact Assessment Report P6978-R1-V1, NoiseAir, 12th January 2024 - Proposed Elevations (ASHP - East), Drawing no. 3.1B - Proposed Elevations (ASHP - East 1:20), Drawing no. 4B - Proposed Elevations (ASHP - North), Drawing no. 5.2B - Proposed Elevations (ASHP - North 1:100), Drawing no. 5.1B - Proposed Elevations (PV panels - West), Drawing no. 2A - Proposed Elevations (PV Panels - South), Drawing no. 1A - Proposed Elevation (PV panels - East) , Drawing no. 3.3B | 2025-06-21 |