Fact Field Value Latest Entry Date
7ae4073ba97c19910c827f00916664d0526c7f5138df7c8a2c0bc408b9a5be80 description The development shall be carried out in accordance with the submitted flood risk assessment (ref 23-183 / Michael Evans and Associates Ltd / Sept 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.84 metres above Ordnance Datum (AOD) - Flood resistance and resilience measures shall be installed as detailed within S5.4 of the submitted FRA These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21