FRA Compliance

Provenance

Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
cf02dcf838c01ecd60269e94a366eb9e1fc57b7885e5d3be3dcf5ebbecf87e17 description The development shall be carried out in accordance with the submitted flood risk assessment prepared by Howard J Wroot, referenced 2nd Addendum, dated 29 January 2024, and the following mitigation measures it details: - Finished floor levels of the workshop shall be set no lower than 4.65 metres above Ordnance Datum (AOD). - Flood resilience and resistance measures shall be included as detailed in the submitted FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 2025-06-21