CTMP

Provenance

Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
b28b3c9cd5d8318be4ca632d499b6f1b7658110315ede9c5442ddb703a0530f0 description No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for the following and answered in the order they are written below, for ease of checking with additional information appended at the end: i. The site compound and parking of vehicles for site operatives and visitors ii. Identification of agreed access points and routing from the Classified road network iii. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) iv. Contract duration v. The areas for loading and unloading of plant and materials vi. Storage of plant and materials used in constructing the development vii. The location, erection and maintenance of any security hoarding to be installed viii. Wheel washing facilities (location and type) ix. measures to control noise and the emission of dust and dirt during construction x. Temporary signage on the adopted highway 2025-06-21