Skip to main content

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
4e5942b2172ce272992a90e8df289a4efca44cc9393b3debc38135d27e5b3183 description There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which shall be submitted to and approved by the Local Planning Authority prior to the commencement of above ground works. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate based on the existing peak discharge rate during a 1 in 1, 1 in 30 and 1in 100 year storm event. 2025-02-25