Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
8896a47b17c6f0f6b5756966982e36722396d0ebc0524917826595e2235763f4 description Change of use of the gymnasium at basement and first floors (D2) and the studio and gallery on third floor (sui generis use), along with the retention of office on the other floors, for office use (B1); installation of roof lights to the rear/side roof-slope and installation of air condenser units to the rear elevation at roof level. 2025-09-09