Filters

Field

1 selected
Field
Clear

1 result

Fact Field Value Latest Entry Date
34565712e346b3111b7122597243e5dfbca796249e02c11b566998f45dc07f73 description Internal and external alterations including the replacement of the existing shopfront, installation of a new timber door, painting of architrave surround, formation of new steps form the arch on Shelton Street, covering of the existing void, removal of kitchen enclosure/stud walls to create an open plan floor, installation of a stud wall and door within basement vaults, new opening within stud work wall, installation of a new fire lobby, installation of new fire door and refurbishment of the existing lift. 2025-09-09