Skip to main content
Mineral exploration
Provenance

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
8911d9d5b52673c13ea1d67b17af7c30372b6c7456a8a5af32178cc74d6d62bc description Development on any land during a period not exceeding 28 consecutive days consisting of– (a)the drilling of boreholes; (b)the carrying out of seismic surveys; or (c)the making of other excavations, for the purpose of mineral exploration, and the provision or assembly on that land or adjoining land of any structure required in connection with any of those operations. 2024-03-27