Skip to main content

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
f6916512547db565b64f5c470014df0e3173b741d0070b6bff4472567591ddf2 description Development by or on behalf of a sewerage undertaker consisting of: (a) development not above ground level required in connection with the provision, maintenance or repair of a sewer, outfall pipe, sludge main or associated apparatus; (b) the provision of a building, machinery or apparatus in, on, over or under land for the purpose of survey or investigation; (c) the maintenance, (d) the installation in a sewerage system of a pumping station, control panel house or switch-gear house; (e) any works authorised by or required in connection with an order made under section 73 of the Water Resources Act 1991 (power to make ordinary and emergency drought orders)(56); (f) any other development in, over or under their operational land, other than the provision of a building but including the extension or alteration of a building. 2020-12-31