20/00860/FL
Provenance
3 results
Fields:
notes
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
b48798c423ca15e56c87e46d343f9306a49235b3827cdc8ce98f4fb44b60ee3d | notes | A full planning application (20/00860/FL) was granted for the construction of 78 dwellings and proposed infrastructure. Previously outline planning permission for the development of up to 84 residential dwellings was refused in April 2019 but allowed on appeal in January 2020. Development commenced on site in March 2022. 71 dwellings have been completed on the site, the remaining 7 are still underconstruction. | 2024-03-31 | |
cd3a23872de54f82ad6fa01079898ab1841bcb046a58bf9d721717e494e57e4d | notes | A full planning application (20/00860/FL) was granted for the construction of 78 dwellings and proposed infrastructure. Previously outline planning permission for the development of up to 84 residential dwellings was refused in April 2019 but allowed on appeal in January 2020. | 2022-07-19 | |
ef65f3867a1fe7289bbd150f3466e1b5fc97b817e0dd5ff51812e2b0378137fe | notes | A full planning application (20/00860/FL) was granted for the construction of 78 dwellings and proposed infrastructure. Previously outline planning permission for the development of up to 84 residential dwellings was refused in April 2019 but allowed on appeal in January 2020. Development commenced on site in March 2022, 22 dwellings were completed in 2023. | 2023-03-31 |