6403
Provenance
3 results
Fields:
notes
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 3bbc708d4c16dc49a1a4f9691717a754b593711a3d25a7bc71b11863a5fd6298 | notes | Site occupied by existing commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site construction of 7 dwellings was permitted in 2010 (09/B/0553). A further application to amend the permitted scheme, adding another dwelling was permitted in 2013 (13/00403/FUL). This increased the total yield to 8 homes. Under-construction, with only 1 unit now remaining outstanding. Forecast for completion within the next 5 years. | 2020-12-17 | |
| 3cb484db770cfa0e627961bd4898346440b2490f80e43e11f4305c98943a5484 | notes | Site occupied by existing commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site construction of 7 dwellings was permitted in 2010 (09/B/0553). A further application to amend the permitted scheme, adding another dwelling was permitted in 2013 (13/00403/FUL). This increased the total yield to 8 homes. The final unit was commenced in 2015 but remained outstanding for some time, although works have now been concluded. Development of 8 dwellings complete in 2020/21. | 2021-12-17 | |
| bf680696d949fcbeca1e30cbf02a0cdaf57c1c265d81d7f8c2f29843432555dc | notes | Site occupied by commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site and construction of 7 dwellings was permitted in 2010 (N/09/B/0553). Site works initially commenced in 2011. A further application to amend the permitted scheme, adding another dwelling to the overall total, was permitted in 2013 (13/00403/FUL). This increased the yield to 8 homes. During 2014 and 2015, 7 of the dwellings were completed. The final unit was commenced in 2015 but remained outstanding for some time, although works did eventually recommence. Development of 8 dwellings complete in 2020/21. | 2021-12-17 |