6403
Provenance

Filters

Field

1 selected

Field

Clear

3 results

Fields: notes
Fact Field Value Latest Entry Date
3bbc708d4c16dc49a1a4f9691717a754b593711a3d25a7bc71b11863a5fd6298 notes Site occupied by existing commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site construction of 7 dwellings was permitted in 2010 (09/B/0553). A further application to amend the permitted scheme, adding another dwelling was permitted in 2013 (13/00403/FUL). This increased the total yield to 8 homes. Under-construction, with only 1 unit now remaining outstanding. Forecast for completion within the next 5 years. 2020-12-17
3cb484db770cfa0e627961bd4898346440b2490f80e43e11f4305c98943a5484 notes Site occupied by existing commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site construction of 7 dwellings was permitted in 2010 (09/B/0553). A further application to amend the permitted scheme, adding another dwelling was permitted in 2013 (13/00403/FUL). This increased the total yield to 8 homes. The final unit was commenced in 2015 but remained outstanding for some time, although works have now been concluded. Development of 8 dwellings complete in 2020/21. 2021-12-17
bf680696d949fcbeca1e30cbf02a0cdaf57c1c265d81d7f8c2f29843432555dc notes Site occupied by commercial buildings that have latterly only been utilised for storage purposes. Identified for potential redevelopment following demolition. An application for clearance of the site and construction of 7 dwellings was permitted in 2010 (N/09/B/0553). Site works initially commenced in 2011. A further application to amend the permitted scheme, adding another dwelling to the overall total, was permitted in 2013 (13/00403/FUL). This increased the yield to 8 homes. During 2014 and 2015, 7 of the dwellings were completed. The final unit was commenced in 2015 but remained outstanding for some time, although works did eventually recommence. Development of 8 dwellings complete in 2020/21. 2021-12-17