3088
Provenance
3 results
Fields:
notes
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 0004174a3764f3e44b1c8b33f010acb02e02f1de9c5f8b155e7aebb198320c3b | notes | Operational telephone exchange, consisting of the main building and associated land. It has been suggested in the past that the site may become surplus to requirements in future, however, the site remains operational and it has recently been confirmed (EiP 2020) that the site will not be available for redevelopment for the foreseeable future. Any timescale for this change is dependent on operational and business needs of BT. This position could change in the longer-term but no residential development is forecast within the plan period at present. | 2020-12-17 | |
| 1b5934719760c42cafaf78beb8122fe1f12eb04e5a67ce7e7189fe461d0d0d74 | notes | Operational telephone exchange, consisting of the main building and associated land. Facility currently utilised, and is not currently available, although it has been suggested in the past that the site may become surplus. Any timescale for this change is dependent on operational and business needs of BT. Recently confirmed the site will not be available for redevelopment for the foreseeable future. This position could change in the longer-term but no residential development is forecast within the plan period at present. | 2020-12-17 | |
| 2a3b8c2b93be2c516198712831414457234343ac2f6753af1d526aeecf4c1593 | notes | Operational telephone exchange within the town centre. Due to this the land is not available for redevelopment in the short-term but it is understood this could change over the plan period. Potential therefore exists in the longer-term depending on the business needs of BT. A development of a higher density would be suitable for the central location, potentially through a flatted scheme. | 2019-12-17 |